Validate synchronized data in Workday
After running the Workday Accounting Center connector, validate that the data was processed successfully in both Integration Hub and Workday.
Validate the Integration Hub job:
- In Zuora, go to Marketplace > Integration Hub.
- Select Workday Accounting Center.
- Open the Execution tab.
- Verify that the job status is Success.
- Review the execution logs for extract details, transformation details, upload status, and processing errors, if any.
Validate data in Workday Prism:
-
Sign in to Workday.
-
Open the Prism table associated with the connector capability:
- Billing
- Revenue
- FX Gain/Loss
-
Verify that:
- new records were loaded successfully
- the correct accounting period or batch was processed
- expected field values were populated correctly
Validate Accounting Center processing:
- Open the corresponding Accounting Center batch in Workday.
- Verify that the batch was created successfully and completed processing without errors.
- Confirm that journal entries were generated as expected.